Drama Progress


On 13th April 2016, our production crew filmed scenes 2 and 4 at our first location (Francesca's House) and partly filmed scenes 1 and 5 for the theatre shots at the Marvin Theatre. The shoot took around 6 hours starting at 10:30 am  and finishing around 4:30 pm. Here are some photos from behind the scenes.





Current Footage


After filming on the 13th April, we create a rough cut of the footage to show in our progress one to one meeting with out lecturer. The rough cut was a simple edit to show the order of the footage. The rough cut for this drama can be seen below.


The Stage Rough Cut from Phillip Cullen on Vimeo.

I also created a quick mock-up of the Letterbox Framing (Ratio 1.85:1), Colour Correction and Colour Grade. This is an example edit for the potential post-production factors for the final edit. This example can be seen below.


The Stages [CC & Frame TEST] from Liam Atkinson on Vimeo.


Production Documentation


(Each document was delegate to the crew member in the relevant production role.)